Project
Description:
Provide Survey, Engineering, Right-of-Way Acquisition
and Environmental Permitting services for the
preliminary design, construction and as-built
phases of a proposed 4.5-mile natural gas pipeline
project. The preliminary design effort includes
providing all pipeline-related drawings, obtaining
the necessary environmental and engineering permits,
and acquiring permanent and temporary easements
in support of the project. The contracted project
scope for Coler & Colantonio, Inc., through
construction, included environmental inspection
and compliance monitoring, as well as all, necessary
detail construction as-built survey requirements. |
 |